20M HDMI Cable Gold Shielded v1.4 HIGH SPEED Long Lead with Ethernet

20M HDMI Cable Gold Shielded v1.4 HIGH SPEED Long Lead with Ethernet
  Zoom
 20M HDMI Cable Gold Shielded v1.4 HIGH SPEED Long Lead with Ethernet20M HDMI Cable Gold Shielded v1.4 HIGH SPEED Long Lead with Ethernet 
Our Price:  £18.50
(Inc. 20% VAT)

Availability:  

  

In stock

+


JUSTOP

Great Value, High Quality HDMI Cable

High Speed HDMI Cable V1.4 Supports HDMI Ethernet Channel, Audio Return Channel, 3D Capabilities & 4K

Supports 720p, 1080i, 1080p & Higher Resolutions

Our HDMI Cables offer you reliability and robustness, along with a great picture. Can be used with CCTV DVR’s, DVD Players, TV’s, Set Top Boxes, and other Audio and Visual Devices.

View More HDMI Cable Sizes 

Specifications:

  • HDMI Ethernet Channel
  • Audio Return Channel
  • 3D Support
  • 4K Support
  • HDMI Type A Connectors
  • HDMI High Speed with Ethernet (v1.4)
  • Gold Plated Connectors
  • 30AWG CCS

What is an HDMI Cable:

HDMI (High Definition Multimedia Interface) is a specification that combines video and audio into a single digital interface for use with DVD players, digital television (DTV) players, set-top boxes, and other audiovisual devices.

HDMI supports standard, enhanced, or high-definition video plus standard to multi-channel surround-sound audio.

High Speed with Ethernet supports up to 1080p and beyond with a built in Ethernet channel. Gold flashed contacts provide a higher quality finish while providing anti-corrosive properties.

Model:  1006861
Bar Code:  0761856016613
Part Number:  5001-2A
Brand:  JUSTOP
Length:  20 M
Cable Standard:  V 2.1
Max. Resolution:  8K

Be the first to Write a Review for this item!

JUSTOP LTD